Homer Watson Business Park
Industrial & Manufacturing

Homer Watson Business Park

Location

Kitchener

Partners

Perimeter Development

Project overview

The former Budd Canada plant was constructed in 1967 and operated as an automotive frame manufacturing facility until its closure in 2008. Redeveloping the 120-acre property required more than preparing the site for new construction—it required addressing the environmental legacy of its industrial use while coordinating civil infrastructure, demolition, servicing, grading, stormwater management, and municipal approval requirements.

MTE was engaged to support the redevelopment and help the client secure multiple Records of Site Condition (RSCs). The property was divided into parcels for a range of future uses, including industrial, commercial, parkland, and stormwater management, allowing the redevelopment to progress through a coordinated approach to assessment, remediation, engineering, and site preparation.

MTE's Involvement

MTE provided multidisciplinary services throughout the redevelopment, combining civil engineering with environmental assessment, risk management, structural demolition, and infrastructure decommissioning.

For the industrial development, MTE provided civil engineering services for four industrial blocks, completing the detailed grading, servicing, and stormwater management design required to advance the site through Site Plan Approval, Building Permit, tendering, and construction. Deliverables included base plans, a Functional Servicing and Stormwater Management Brief, Fire Flow Analysis, preliminary grading, detailed site engineering, and tender drawings.

MTE also completed Phase I Environmental Site Assessments for each parcel, including historical records reviews, site investigations, and stakeholder interviews. Potential environmental concerns identified through these assessments were investigated through targeted Phase II ESAs, helping establish the requirements for remediation and risk management.

The site’s industrial history also presented challenges related to contaminated materials and legacy infrastructure. MTE evaluated building materials for potential reuse and identified concrete contamination. Working alongside the Risk Assessment team, MTE developed procedures that allowed suitable concrete to be reused on site as structural fill, reducing the need for landfill disposal while minimizing associated greenhouse gas emissions.

Risk Assessments were also used to develop site-specific vapour mitigation strategies based on the future development plans. These solutions provided a path toward safer redevelopment without requiring excessive mitigation measures or ongoing monitoring once the approved solutions were implemented.

As part of site preparation, MTE supported the decommissioning of legacy infrastructure, including underground tanks and wastewater systems, as well as structural demolition and construction tendering. This coordinated approach helped prepare the former industrial property for its next phase of development.

As construction progressed, MTE remained involved through periodic general conformance reviews, helping confirm that civil works were completed in general accordance with the approved engineering designs.

By bringing environmental, engineering, and risk management expertise together, MTE helped turn a complex former industrial property into a redevelopment-ready site while addressing its environmental legacy and supporting the infrastructure required for its future use.