Skip to content

News: 97 Victoria Receives Award of Excellence at the Canadian Consulting Engineering Awards

McMaster Campus Master Plan
Education 

McMaster Campus Master Plan

Location

Hamilton, Ontario

Partners

BDP Quadrangle

Project overview

The Campus Master Plan is focused on protecting and enhancing these natural and hydrologic
features while supporting long-term campus growth. Key objectives include restoring lands along
Spencer Creek, improving stormwater management practices, and providing opportunities to
engage with the natural environment through the existing trail network.

MTE provided multidisciplinary technical support for
the Campus Master Plan, including natural heritage,
ecological restoration, hydrogeology, civil engineering,
and stormwater management. The work focused
on low-impact development and climate resilience,
integrating best practices for managing stormwater,
groundwater, and natural systems

MTE's Involvement

Our Environmental team completed a natural
heritage study using existing ecological data and field
investigations to confirm vegetation communities,
wetlands, tree cover, and other features. Consultation
with regulatory agencies and stakeholders informed
a natural heritage report outlining constraints,
opportunities, and mitigation strategies, along with a
conceptual restoration plan for the Spencer Creek trail
corridor.

Our Civil team updated hydrogeological data and the
hydrostratigraphic model to guide future development
while maintaining groundwater recharge and
hydrologic function. We coordinated with the City and
Conservation Authority to address servicing, drainage,
and stormwater management, and prepared a civil
engineering section outlining sustainable design and
green infrastructure strategies for the Master Plan.