Mill One
Industrial & Manufacturing

Mill One

Location

Sault Ste. Marie

Partners

The BMI Group

Project overview

The former paper mill at 80 Huron Street in Sault Ste. Marie, Ontario, is undergoing redevelopment following the partial demolition of the former mill facilities. The remaining site includes Board Mill space and Pulp Tower space, along with paved and landscaped areas.

The Board Mill and Pulp Tower are heritage-designated buildings, making the assessment of their existing condition an important component of the redevelopment process. As portions of the heritage buildings and façades are being retained and salvaged, understanding the condition of the remaining structures and building components was critical to supporting future redevelopment plans.

The Mill Tower and adjacent Board Mill are in the process of being designed by the leading Canadian architectural firm Martin Simons Sweers as a vibrant mixed-use, hospitality, office, and institutional, development

MTE's Involvement

MTE was retained to conduct a Building Condition Assessment (BCA) of the two remaining heritage-designated buildings. As part of the redevelopment, portions of the heritage buildings and façades are being salvaged.

MTE’s assessment included a review of available documentation, previous condition reports and upgrades, consultation with key facilities personnel, and one site visit for visual, non-destructive assessment. Particular attention was given to the structural condition and building façades. The review covered the building structure, roofing, building envelope, common mechanical and electrical systems, and site pavements and hardscaping.

Quantitative testing and detailed calculations were not included.
MTE’s deliverable was an electronic BCA report documenting the observed components and their current condition, identifying deficiencies and potential code issues, and providing estimated current capital costs and anticipated repair or replacement timelines.