MTE's Involvement
MTE was proud to provide structural engineering services for the development of Toronto Metropolitan University’s new School of Medicine, helping transform the former Bramalea Civic Centre into a modern and sustainable academic hub. As part of the project, MTE was retained to provide cold-formed steel (CFS) design services for the exterior walls, windows and soffits. Our involvement extended throughout the building, with our team also designing CFS systems for interior platforms, stair framing and guard walls, as well as the framing required to support the distinctive wood fins incorporated into the atrium’s drywall ceiling.
A key objective of the project was to reuse as much as possible from the existing four-storey concrete building, which was constructed more than 50 years ago as the Bramalea Civic Centre. Through strategic upgrades and retrofit conversions, the project team was able to give the existing structure an entirely new purpose while reducing the need for new construction. Cold-formed steel was well suited to this approach. Its lightweight nature helps minimize additional loading on existing structures, while prefabrication can reduce on-site material waste and support more efficient installation. CFS is also recyclable, durable and non-combustible, helping the building envelope improvements align with the client’s long-term sustainability and emissions goals.
Working within an existing concrete structure also presented one of the project’s biggest engineering challenges. Following demolition of the original framing, variations in the existing concrete slab edges became apparent. Some slab edges were misaligned, while portions of the older concrete had deteriorated, affecting where the new exterior CFS walls could be installed. The original design specified a 3 5/8-inch stud wall positioned on the slab below and spanning to the underside of the slab above. With the existing slab edges varying from the anticipated conditions, the framing design needed to be adapted.
This type of discovery is not uncommon when modernizing a decades-old structure. The challenge was finding a solution that responded to the conditions uncovered during demolition while maintaining adequate support for the new exterior walls, architectural panels and cladding—all within a tight construction timeline. MTE recommended increasing the framing to 6-inch studs, providing additional width to accommodate the gaps created by the inconsistent slab edges while maintaining a flush exterior face.
Maintaining that exterior alignment was particularly important for the building’s new Building-Integrated Photovoltaic (BIPV) panel system. By using wider studs and designing within the allowable limits of the steel stud wall overhang, the framing could remain adequately supported at the top and bottom without requiring significant restoration of the existing concrete. Recognizing that additional variations could be uncovered as construction progressed, MTE also developed multiple connection scenarios at the underside of the existing deck. This gave the construction team options to respond to different site conditions rather than relying on a single connection detail.
The building’s new strip windows presented another design consideration. Additional steel was incorporated to support the weight of the BIPV cladding system while providing lateral support to the window openings. The solution also helped reduce the amount of material and labour required along these elevations. By adapting the stud size to the existing conditions, the team was able to limit the amount of concrete restoration required to accommodate the new exterior walls. Rather than allowing unexpected conditions uncovered during demolition to stall progress, MTE worked collaboratively with the other design consultants to identify practical solutions, streamline decision-making and improve coordination.
The result maintained the intended architectural vision while allowing construction to regain momentum and move forward with a clearer path. CFS also played an important role in bringing the building’s transformed interior spaces to life. Within the atrium, the architectural design features large wood fins suspended using CFS framing designed by MTE. In the library, tall continuous guard walls were tied back to existing steel beams supporting the original concrete slabs, allowing elements of the building’s existing structural system to serve an entirely new purpose.
Throughout the project, the goal was to work within an acceptable construction footprint by making use of as much of the existing structural framing as practical while introducing the new systems required for a modern medical education facility. The completed TMU School of Medicine demonstrates how adaptive reuse, creative architectural design and responsive structural engineering can work together to transform an existing building. Through adaptable CFS solutions, MTE helped navigate the realities of working within a more than 50-year-old concrete structure while supporting the project’s architectural, construction and sustainability objectives.