MTE's Involvement
MTE was proud to provide environmental, geotechnical and hydrogeological services for the preliminary design of the infrastructure upgrades.
As part of the environmental service, MTE completed excess soil planning documents (Assessment of Past Uses, Sampling and Analysis Plans, Soil Characterization Reports, and an Excess soil Destination Report). These planning documents were used to support the potential beneficial re-use of these soils off site and allow contractors to understand the soil conditions prior to construction.
Additionally, a geotechnical investigation was completed to confirm the subsurface conditions, including soil stratigraphy and recommended pavement design. A hydrogeological investigation was prepared to support water takings (dewatering) during construction in the form of an Environmental Activity and Sector Registry (ESAR).
This project included a review of historical records, as the roadways and nearby properties were in a long-established area of Guelph. Fieldwork addressed several challenges, including managing field activities in a heavy traffic area while temporarily closing a busy roadway in the city core and drilling in shallow bedrock conditions.