MTE's Involvement
At the project’s outset, our team thoroughly reviewed all existing background information to develop a base plan for schematic and detailed site engineering. Our scope included preparing site grading and servicing plans for submission to the Town of Milton and Halton Region, as well as a servicing strategy and stormwater management report.
During construction, we provided contract administration and performed regular site inspections to ensure the work complied with the approved engineering drawings. The ESA conducted early in the project revealed minimal areas of concern, allowing us to confidently eliminate the need for ongoing environmental assessments.